Photo Gallery 4

Text Box: July 18
Text Box: Text Box:

The rotary floors are being prepared for concrete

The Milk Tank has been placed into the barn

The alley from the livestock barn to the rotary barn is being prepared

The ceiling in the barn is in, in some parts

The vents are in the back of the barn

The back of the barn with the vents in place

This website was made and designed by ;

 

 

 

Jake Vermeer
Text Box: July 22

The workers prepare the outside floor for concrete.

Getting cement.

The big doors at the front of the barn are being installed

Text Box: July 27

The Green cement is being poured, it looks really good

The cement is poured but still needs some finishing touches

Top angle view of the rotary, the place of the camera is where the visitors will be observing the milking.

Feedback Form
Text Box: July 31st

3/4 of half the barn has stalls in.

The curbs are also in, the curbs will hold the sand in the stalls

The front doors have also been installed